The building of the car center in the Obolonsky district of Kiev.
The reason for petition
Precipitation columns of the building frame, cracks in the walls and partitions.
Problem
Inhomogeneous bulk soil at the base of the foundations.
Sediment of strip foundations of the frame.
Work done
Soil stabilization at the base of the strip foundations of the frame.
Applicable Methods
Deep Lifting.
Scope of work
36.5 m.p. (95 sq. m.) Strip foundations.
The work was performed without stopping the operation of the building.